Repairs to begin on Winona bridge
Go Deeper.
Create an account or log in to save stories.
Like this?
Thanks for liking this story! We have added it to a list of your favorite stories.
Motorists can expect delays as repairs begin Tuesday on three gusset plates on the Highway 43 bridge over the Mississippi River in Winona.
The Minnesota Department of Transportation says the equipment needed to complete the repairs requires a lane closure, and traffic will be reduced to a single lane from 8 a.m. to 6 p.m. Both lanes will be open each evening.
MnDOT says corrosion was found on several gusset plates during last week's in-depth bridge inspection.
Repair work may continue into next week. MnDOT expects both lanes will be open over the Fourth of July weekend.
The bridge is scheduled for a major overhaul or replacement in 2014.
(Copyright 2010 by The Associated Press. All Rights Reserved.)
Turn Up Your Support
MPR News helps you turn down the noise and build shared understanding. Turn up your support for this public resource and keep trusted journalism accessible to all.